| Scope of Work |
-
-
Construction Of Rcc Ohsr, Cwr, Glsr, Providing, Laying And Jointing Pipe Lines,
Pump Sets, And Other Allied Works Along With Operation And Maintenance Of
The Scheme At South Extension, Uwss Udaipur For Five Years After Completion
Of Twelve Months Defect Liability Period On Single Point Responsibility Basis
Including Twelve Months Defect Liability Period On Single Point Responsibility Basis
-
1. Raw Water Rising Main from Ambaghati Turn on Existing Jaisamand pipeline to proposed WTP :
- a. DI K-7 400 mm 1420 mtr Pipe Laying
-
2. Water Treatment Plant :
- a. 5859 KLD WTP at Ambaghati Hillock
-
3. Clear Water Reservoir and Pumping Machinery :
- a. Clear Water Reservoir : 550 KL
- b. Clear Water Pump House : 4439 lpm @ 60 m head (1W+1S) (Centrifugal Pump Sets)
-
4. Clear Water Rising main from CWR to GLSR :
- a. DI K-7 400 mm 200 mtr.
-
5. Ground Level Service Reservoir :
-
6. Transfer Main from GLSR to OHSR at R4 & R5 Block :
- a. DI K-7 , 400 mm- 2850 Mtr , 300 mm-260 Mtr, 250mm-3380 Mtr
-
7. Overhead Service Reservoir :
- a. Overhead Service Reservoir near R4 Block: 800 KL, 22 m staging
- b. Overhead Service Reservoir near R5 Block : 1000 KL, 22 m staging
-
8. Distribution Network from OHSR to R4 Block:
- a. DI K-7 660 Mtr Pipe Laying
-
9. Distribution Network from OHSR to R5 Block :
- a. DI K-73292 mtr Pipe Laying
|